NOVEMBER 04
------------------------------------------------------------------------------------------------
LTM 1500
189' MAIN +13' ADAPTOR
276' LUFFING JIB,
Y GUY SUPERLIFT WITH SPACER
COOLING TOWERS TO BE LIFTED AT 172' RADIUS
VIEW FROM THE ROOF SUPERLIFT IS VERY WIDE
REMOVAL OF SUPERLIFT
------------------------------------------------------------------------------------
LTM 1250
236 main 72 ft jib at 30 degree
Lifting ac equipment to the 22 floor in Manhattan
------------------------------------------------
GMK 6300
WORKING IN NJ. SETTING GENERATORS AND CUSTOM RADIATORS
ON NEW WATER TREATMENT PLANT
Chiller rig in Manhattan
2 Chillers 9 ton each had to be lowered 30 ft into a basement.
However it was not a straight shot down as we had to avoid pipe that could not be removed.
Rigging into the building
coming in
Opening the floor slabs
Removing water box from Barrels
Moving chiller over hole
Going down
Job took 2 days due to the Theatres schedule all openings had to be made and closed up in this period,
no prep work was allowed ahead of time.