Feburary 05
LR 1400/1 WORKING IN MANHATTAN
START ASSEMBLY AT 10 PM
28 TRAILER LOADS FOR CRANE ASSEMBLY
JOB 10PM FRIDAY UNTIL 5 PM SATURDAY
7 AM SUNDAY UNTIL 7PM SUNDAY
CRANE WAS DISASSEMBLED AND REMOVED IN 8 HOURS
READY TO BOOM UP 10 AM
207' MAIN BOOM 299' LUFFING JIB
BOOMING UP
OUTRIGGERS
GOING UP
UP IN THE AIR
MORE TO COME
LTM 1100 WORKING IN LOADING DOCK OF HOSPITAL IN BRONX NY.
CRANE HAD TO BE SET UP ON EXTREME SLOPE
WE USED 2 12"X12"X 20' LONG TIMBER MATS TO HELP DRIVE THE CRANE UP TO A
SUITABLE HEIGHT FOR CRIBBING TO BE EFFECTIVE BUT NOT DANGEROUS
COOLING TOWERS WEIGHED 4 TON AND WERE RIGGED OUT TO 100' RADIUS
FLAGS ON ROOF INDICATE CONTROLLED ZONE AS THE HOSPITAL WAS OCCUPIED
THIS AREA WAS EVACUATED DURING THE LIFTING
JOB WAS COMPLETED SAFELY AND ON SCHEDULE
---------------------------------------------------------------------------------------------------------
LTM 1250
we set up in parking lot
160000lbs of ctw
unit weighs 9.5 ton
tight but it worked nicely
unit rigged out to 115' radius
nice deflection in the boom 236'
--------------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------------------------------