August 04
Ltm 1100 from A.J. Crane in Westchester working for us
at SUNY Purchase central boiler plant rigging in new boiler
Crane had to be set up in upper lot as truck that delivered Boiler could not get down the hill.
We transferred the boiler on to our trailer for the hill.
Boiler weighed 65000lbs.
2nd setup outside the boiler plant.
Inside the plant.
Boiler was pulled 400ft down alley way between existing boilers, 2 " to play with on each side.
using hydraulic jacking system
Tight fit
Unit had to be brought in under pipe rack .25" clearance in some places unit had to be "soaped in"
Interesting job.
LTM 1400 working august 8 in Manhattan
50 ton of counterweight.
Chad
roof is 297' high
154' main 230 jib lifting 13,000lbs emergency generator
-----------------------------------------------------------------------------------------------------------------------------------
M 1250 working at the New York stock Exchange August 2004
Crane was set up on Broad street over the subway.